Prihoda Journal

NEW INSTALLATION

Puma BKC Office, Mumbai, India

This is a unique open ceiling office for Puma Energy & Trafigura Global. The project was designed by Lab Architects with three colour combinations (red Fire pipes, white Fabric ducting and grey tables and carpet). One of the main challenges was to optimize the design of our white colour diffusers to match their interior and lighting preferences.  Prihoda India and the M/S OPAL HVAC Engineering team completed a flawless installation in just six days. It is an example that also a wire installation can be very well looking if all details are properly carried out. Customer is very happy with performance as well as appearance and has already started recommending our brand for his other projects.

61.906 m3/h
of air passes through our diffusers
232 m
of diffusers have been installed
100 Pa
pressure is harbored in our diffusers
Available airflow: 61.906 m3/h
Diameter: C406, C457, C508
Length of diffusers: 232 m
Material: PMS WHO